中文(wén) | English
 
  News
Dongyue News
MT & Customer
Industry News
 
News Home >> News >> MT & Customer
 
Dongyue successfully passed Caterpillar’s BGPP Audit
Contributor:

   On Oct.30,2015, Caterpillar Painting Engineer Mr Xu(Xu Zejiang) carried out BGPP(Benchmarking Guide for Painting Process) Audit in Dongyue. Rely on proper process route, steady equipment control and good painting performance, Dongyue eventually passed BGPP Audit with outstanding results: 80.8 points(Tier Three Caterpillar Painting Supplier); Meanwhile Dongyue also passed Caterpillar’s CCT(Cycle Corrosion Test)Sample Test.

   BGPP is acronym for “Benchmarking Guide for paint process”. Developed by Caterpillar CPS-painting team, the template is used to evaluate and analyze supplier’s painting ability. It carried out from five aspects: 1. Understanding and compliance to CAT specifications (the weight); 2. The impact caused by facility to painting workshop; 3. The audit aiming at painting line; 4. Painting quality; 5. Assessment result. Caterpillar assesses supplier’s painting level from these five aspects comprehensively.

   Based on Salt Spray Test, CCT Sample Test is a further test for adhesion performance and anti-corrosion performance as these two are lifelines of paint. The biannual CCT sample test is Caterpillar’s request to suppliers. If failed in test with continuous three times, Global Purchasing will take some action including terminate supplier’s painting business.

   In the depression of machinery industry, appearance requirement from customer extent to an extremely strict degree, this inevitably presents new requests and challenges to Dongyue which serve as one of Caterpillar’s global fabrication suppliers. Only by meeting customer’s requirements and surpass them, can provide an unremitting drive to Dongyue’s unceasing development.

 

 Caterpillar Painting Engineer is checking and testing Dongyue's painting room and painting process

Caterpillar Painting Engineer is checking and testing the phosphating line

Caterpillar Painting Engineer summarized BGPP audit result in meeting room

 

 
 
Print this page || Close window
 Last chapter:Dongyue successfully passed Caterpillar’s SQEP Audit
 Next chapter:Dongyue Successfully Passed 2016 Caterpillar BGPP Audit
About us
Company Info
Management Policy
Company Structure
Honorary qualification
News
Dongyue News
MT & Customer
Industry News
Products
Hex
Whex
Paving
Grader
Track Drills
Equipments
Cutting&Forming
Welding
Machining
Painting
Welding Inspection
Painting Inspection
Dimension Inspection
Careers
Talent idea
Welfare benefit
Cooperative website
Service
Customer distribution
Contact us
Office system
Enterprise post office
Internal mailbox
Employee Forum
 
Copyright: Jiangsu Dongyue Engineering Machinery Co. Ltd.
Linkcaterpillar